Control Tower

Link the programme to the model and the field: As-Built 4D, cost and cash flow, and a claims replay that reconstructs delaying events for EOT and delay analysis.

The problem

A 4D fly-through is not enough

Anyone can animate a build sequence. What supports a claim is As-Built vs planned tied to evidence, critical-path shifts, and a replay of what actually delayed the project.

Linked 4D schedule, progress and cost intelligence over a live construction project.

Concept visual · linked 4D, progress and cost intelligence

How it works

Inputs, workflow, outputs

Inputs

  • Primavera P6 / MSP / CSV
  • WBS & activities
  • Model segments
  • Actual dates / progress

Workflow

  • Import & link to segments
  • As-Built vs planned
  • Delay & critical-path signals
  • Claims replay

Outputs

  • As-Built 4D view
  • Delay & critical-path report
  • Cost / cash-flow view
  • EOT evidence pack

"Live" means built and tested inside the system.

Live Built & tested

  • Activities linked to model segments
  • Planned vs actual delay signals
  • CSV schedule import
  • Project time machine (state on any date)

Roadmap In development

  • Direct Primavera API link
  • Generative what-if scheduling
Start small

4D Readiness Assessment

We link your programme to the model and show As-Built vs planned on one live project.

DEIM provides decision-support and document-assistance tools, not legal advice. Legal outputs require review by qualified counsel. Each client's licensed standards and contracts are used isolated within their own project.